Bringing innovation to construction
Stockland and INKA Construction have collaborated on these terraces on Zinc Lane in Calleya to bring a fresh sense of vibrancy to the area. Our time-lapse cameras were on-site from the ground works all the way through to the completion of the exterior, a process which took about 18 months. Check out the videos below to see Stage One and Stage Two as the terraces take shape and reach completion.